Average business days to repair priority regulatory signs after notification
Maintain the City’s transportation infrastructure. — Repair the City’s street lights, traffic signs, and signals in a timely manner.
* Year to date — this fiscal year isn't complete, so it's not compared against prior years in the target/trend status above.
View as table
| Fiscal year | Actual | Target |
|---|---|---|
| FY22 | 1.4 days | 3 days |
| FY23 | 1.4 days | 3 days |
| FY24 | 1.5 days | 3 days |
| FY25 | 1.5 days | 3 days |
| FY26 (YTD) | Not available | 3 days |
1.5 days in FY25 — met the City's own target for this indicator (1.5 days below the 3 days target), though it has trended in the wrong direction over the past 3 years of reported data.
Why this is tracked
New York City's transportation network includes about 800 bridges and tunnels, along with thousands of miles of streets, that require ongoing preventive maintenance - drain cleaning, debris removal, masonry repair, and snow response - to stay safe and usable. A 2024 assessment found 118 bridge sections, representing nearly a fifth of all bridge roadway citywide, in poor condition, reflecting decades of aging infrastructure, much of it originally built in the early-to-mid 20th century. The City's ten-year capital strategy includes over $16 billion for bridge repair, replacement, and rehabilitation to address this backlog.
NYC DOT - Bridges, Are You Traveling Over Troubled NYC Bridges? - THE CITY
Source: Division of Transportation Planning and Management - Traffic Control and Engineering — via NYC Open Data: Mayor's Management Report, Agency Performance Indicators
Coverage shown: FY22–FY26, reported monthly.
Definition: The average number of business days it takes to repair priority regulatory signs (e.g., Stop, Yield, Do Not Enter, and One-Way) after notification to DOT.