NYC Performance Tracker

All topics / Infrastructure and Sustainability / Department of Transportation

Average business days to repair priority regulatory signs after notification

Maintain the City’s transportation infrastructure.Repair the City’s street lights, traffic signs, and signals in a timely manner.

Beats target by 1.5 daysWorsening over 3 years
Lower values are better · in days
123FY22FY23FY24FY25FY26*1.41.41.51.5

* Year to date — this fiscal year isn't complete, so it's not compared against prior years in the target/trend status above.

ActualTarget
View as table
Fiscal yearActualTarget
FY221.4 days3 days
FY231.4 days3 days
FY241.5 days3 days
FY251.5 days3 days
FY26 (YTD)Not available3 days

1.5 days in FY25 — met the City's own target for this indicator (1.5 days below the 3 days target), though it has trended in the wrong direction over the past 3 years of reported data.

Why this is tracked

New York City's transportation network includes about 800 bridges and tunnels, along with thousands of miles of streets, that require ongoing preventive maintenance - drain cleaning, debris removal, masonry repair, and snow response - to stay safe and usable. A 2024 assessment found 118 bridge sections, representing nearly a fifth of all bridge roadway citywide, in poor condition, reflecting decades of aging infrastructure, much of it originally built in the early-to-mid 20th century. The City's ten-year capital strategy includes over $16 billion for bridge repair, replacement, and rehabilitation to address this backlog.

NYC DOT - Bridges, Are You Traveling Over Troubled NYC Bridges? - THE CITY

Source: Division of Transportation Planning and Management - Traffic Control and Engineering — via NYC Open Data: Mayor's Management Report, Agency Performance Indicators

Coverage shown: FY22FY26, reported monthly.

Definition: The average number of business days it takes to repair priority regulatory signs (e.g., Stop, Yield, Do Not Enter, and One-Way) after notification to DOT.